top of page

Education

Krishna Avanti Primary School
London 
​

Client:  Krishna Avanti Primary School

Main Contractor:  Logan Construction

 

Logan Construction and Ansell and Bailey have completed a beautiful design and build extenion for the Krishna Avanti Primary School in Harrow, London. The construction is timber frame and timber clad with a green roof and exemplar daylighting throughout creating a wonderful teaching environment. The extension is the final phase of  a courtyard arrangment, with the Hindu temple as the focus in the centre. 

 

Tags: Education Architects London UK. Primary School architecture UK. 

 

 

Wellacre Academy
​

Client:  Trafford Council

Project Value:  £8.3million including fit-out

Main Contractor:  J C Turner & Sons, Preston

 

Ansell & Bailey and JC Turner & Sons delivered this stunning new Sixth Form Centre at Wellacre Academy.

 

As a vocational college majoring in the media, the arts and construction technology, the brief explicitly called for the building to showcase both good design and good building practice.

 

A highlight of the atrium is the rich texture of the three storey concrete wall where ripped timber planks were used as shuttering showing that exposed concrete can be a decorative feature.

Tags: Education Architects London UK. 6th Form  architecture UK. 

Teaching Dental Facility
​

Client:  Logan Construction for Queen Mary University London

Project Value: £1 million

 

This refurbishment of the Guttman building in the Olympic Village created a state of the art dental facility for Queen Mary University London and BARTS. The unit includes 4 sedation bays and 2 x-ray rooms.  

 

Every inch of space was put to good efficient use to give the facility the best value for money. The users were very happy with the bright open plan space. 

Tags: Education Architects London UK. HIgher Education Architecture. 

Bloomsbury Theatre Refurbishment
​

Client:  University College London

Project Value:  3 million

Main Contractor: ITC Concepts

 

This project involved extensive strip-out, refurbishment and extension to provide enhanced facilities for UCL’s Bloomsbury Theatre site.

Facilities provided included a fully refurbished auditorium with new bar areas for both the upper and lower circle, a new rehearsal studio at lower ground floor level together with changing rooms and bar together with dressing rooms, backstage offices , stores and new extended toilet facilities.

The principal elevation for further enhanced by the provision of bespoke LED illuminated canopies with distinctive new signage and platform lifts to both the main and North entrances.

Wellacre Eco-Centre
​

Client:  Wellacre Academy

Project Value:  £485,000 (Phase 1)

Main Contractor:  AT Nolan Ltd

 

Read the Building Design Review here.

Thomas Bennett Community College​, Crawley
 

Client:  Thomas Bennett Community College

Project Value:  £1,500,000

Main Contractor: Neilcott Ltd.

6th Form College 
Farnborough
​

Client:  The Sixth Form College, Farnborough

Project Value:  Phase 2 - £2.2m Phase 4  - £1.6m

Main Contractor:  Benson/Bluestone

Rosehill School
 

Client and Main Contractor: Kier Construction Ltd
Project Value: Â£3,450,000
Local Authority: Stockport MBC

Navigation School
 

Client:  Trafford Council 

Project Value:  £2,400,000

Main Contractor:  McGoff & Bryne

Altrincham College of Arts
 

Client:  Trafford Council (with YPLA funding)

Project Value:  £ 5.8 million including fit-out

Main Contractor:  Kier Northern Ltd

Urmston Grammar School
 

Client:  Trafford Council

Project Value:  £675,000 (excluding fit out)

Main Contractor:  McGoff & Byrne

Stretford High School - Sports Facilities
 

Client:  Trafford Council

Project Value:  4.5 million

Main Contractor:  Kier Construction

Bowden School
 

BIM model proposals - please click on the image for a detailed view.

We are honoured to have repeat business with our clients, including many with which we have framework agreements.

Please see below for a list of some of our education projects:

 

Urmston Grammar School – 3 classroom extension

 

Boys & Girls Welfare Society -  Bridge College Hydrotherapy Pool

Moss View Junior School – Major Refurbishment

 

Broad Oak School Trafford – feasibility for extension

 

Longford Park Special Needs School for primary and junior MLD children

 

Wellfield Junior School – Over roofing and refurbishment 

 

Tyntesfield Primary School

 

Tyntesfield Junior School – Over roofing and refurbishment

 

Cloverlea Primary School – Infilling and major refurbishment

 

Farnborough Sixth Form Centre Phases 2 – 4 Student Cafe & Pastoral Centre, New

2 Classroom blocks with linked awning, New Sports Hall

 

Urmston Grammar School – new Theatre, Fitness Suite and classrooms

 

Navigation Primary School – new Primary School on existing school site

 

West Lancashire Academy of Construction – vocational centre in portal frame

 

Urmston Grammar School - Sixth Form Centre

 

Wellacre Academy - Sixth Form Centre

 

Manchester Grammar School Junior Section – Phase 1 Bexwyke Lodge

 

Manchester Grammar School Cricket Pavilion & Conference Facility (planning)

​

Wellacre Academy Eco Centre for Land Studies

 

Together Trust (formerly B&GWS) new Sports Hall for special needs (planning)

​

​Manchester Grammar School Junior Section - Phase 2 Plessyngton Lodge

Rose Hill Primary School Marple, 3 form entry on existing school site

 

Manchester Grammar School Junior Section - Phase 2 Plessyngton Lodge

 

Stretford High School - Sports Hall,  MUGA and grassed pitches

 

Stretford High School – Refurbish existing gym as new Theatre and LRC areas

 

Wellacre Academy – refurbishment for student facilities – SCAPE project

 

Alcester College – refenestration of existing campus buildings – SCAPE project

 

Springfield Primary School, new two storey junior block replacing Victorian block

 

Highbury School – new Secure Entrance Lobby & Reception for special needs

 

Altrincham College of Arts – Re-roofing Arts block and refenestration classrooms

 

Essex University – Dance studio and ancillary facilities.

 

Queen Mary University London – Teaching dental facility

 

Tavistock and Portman Day Centre – Proposals for a special needs school

 

John Donne Primary School, Southwark – Proposals for a new school.

 

Krishna Avanti Primary School, London - Extension

​

University College London - Bloomsbury Theatre Refurbishment

​

Royal Free London NHS Foundation Trust - Charles Wolfson Teaching Labs

​

Vinci - Courtauld Institute

bottom of page